Managed sourcing from Bangladesh, for export and for buyers at home
Get it sourced

Machinery and handling

Lift supplier in Bangladesh

Need a lift supplier in Bangladesh for a new building or a replacement? Send the drawings, stops and rated load. We source passenger, goods and bed lifts from verified sellers, compare specifications like for like, and arrange installation, testing and handover through the seller.

  • Verified sellers
  • Checked before it ships
  • Delivered by Roptan

Get lifts and elevators sourced

Prefer to deal with suppliers yourself? Post it on the requirement board

Lift products

Pick a product and we source it for you, or send one requirement that covers several.

Buying lifts and elevators in Bangladesh

Lifts serve apartment towers and offices in Dhaka and Chattogram (Chittagong), hospitals and hotels, and multi-storey garment and pharma plants in Gazipur and Narayanganj. Buyers are developers, building committees, hospital and hotel managers and factory engineers. A lift runs for twenty years or more, so maintenance, spare parts, energy use and how fast a technician reaches a stuck car matter as much as the price.

Choosing a lift supplier in Bangladesh means matching load, speed and car size to the shaft you have, and planning for load shedding, monsoon water in the pit and hot machine rooms. Send Roptan the drawings, stops and use. We source from verified sellers, compare offers on capacity, drive, warranty and maintenance terms, and arrange installation through the seller. You deal with Roptan only.

Lifts and elevators we source

Passenger lifts

Traction lifts rated in persons and kilograms: 630 kg carries 8 persons, 1,000 kg carries 13. Machine-room-less designs save roof space; a machine room eases service. Choose door width and speed for the traffic, and stainless finishes for humid air.

Goods lifts

Cargo lifts with heavier floors, wider doors and lower speeds, rated for the load and how it enters. If a pallet truck or forklift drives in, floor, sill and rails must take its wheel loads.

Hospital bed lifts

Deep cars that take a bed or stretcher with attendants and equipment, with wide doors, accurate levelling and longer door open times. Put them on standby power, and have the seller confirm the car size against your beds.

Car lifts

Platforms that carry cars to basement or upper parking where a ramp will not fit, a common need on narrow Dhaka plots. Give the longest vehicle's size and weight, floors served, cars per hour at peak and whether drivers stay in.

Escalators

Moving stairs for malls, stations and large hospitals, usually at 30 degrees, or 35 degrees for rises up to 6 m at low speed, with step widths of 600, 800 or 1,000 mm. Give the rise and traffic.

Lift modernisation

Replacing the controller, drive, door operators, ropes or car interior of an old lift while keeping sound rails and structure. It cuts breakdowns and costs less than a new lift; a survey decides what stays, with EN 81-80 as the checklist.

What to tell a lift supplier in Bangladesh

Rated load and persons
Rated load in kg and persons, plus the internal car size and door width you need. Bed, goods and car lifts are sized to the load and how it enters.
Stops, travel and speed
Number of stops, floor heights and total travel in metres. Speed follows from travel and traffic; taller or busier buildings need faster lifts to keep waiting times reasonable.
Shaft, pit and headroom
Clear shaft width and depth, pit depth and headroom from the drawings. Build the shaft after choosing the lift; in older Dhaka buildings the shaft decides the car.
Machine room or not
A machine-room-less lift saves a roof room; a machine room eases service. Either way, ventilate it: controllers and drives have a stated maximum ambient temperature, and roof spaces run hot.
Power and rescue
Three phase, 50 Hz supply, your voltage swings and the generator size. Ask for an automatic rescue device that brings the car to a floor and opens the doors in a power cut.
Pit water
Basement pits flood in the monsoon. Specify pit waterproofing, a drain or sump, and a pit water sensor that keeps the car out of a flooded pit.
Scope, doors and finishes
Who builds the shaft, provides scaffolding and brings power to the controller; door type, car finish, and the price of maintenance after the free period.

Lift standards, tests and handover papers

EN 81-20
Safety rules for the construction and installation of passenger and goods passenger lifts. Ask for the seller's declaration that the lift is built to it.
EN 81-50
Design rules, calculations and tests for lift components such as door locks, safety gear, overspeed governors and buffers. Ask for their type examination certificates.
EN 81-80 and EN 115-1
EN 81-80 guides safety upgrades of existing lifts; EN 115-1 covers escalators and moving walks. Name the one that applies in your order.
BNBC 2020
The Bangladesh National Building Code has lift provisions. Your architect or consultant confirms which apply, and the seller confirms the layout drawing matches your approved plans.
Commissioning test report
Signed, dated results for brakes, safety gear, governor, buffers, levelling, door protection, alarm and rescue device, with the test weights used.

What moves the price of a lift

  • Rated load and car size: bigger cars need larger machines, rails and car frames, especially bed, goods and car lifts.
  • Stops and travel: every landing adds a door, fixings and wiring, and more travel adds rail and rope.
  • Speed and drive: gearless machines with variable frequency drives cost more but use less power than older geared designs.
  • Origin: European, Japanese, Korean, Chinese or Indian make, and whether parts are held in Bangladesh.
  • Finishes and maintenance: stainless or glass cars, door type, and the contract after the free period, with parts or labour-only.

Lead times and delivery

Lifts are made to order for your shaft. Supply typically takes 8 to 16 weeks from approved drawings and advance, including sea freight and clearance; installing a passenger lift then takes 4 to 8 weeks once the shaft is finished, plumb and dry. Escalators and custom cars take longer. Payments usually follow stages: advance, delivery and handover. Roptan confirms dates in the quote.

The seller delivers the lift in crates to your site in Dhaka, Chattogram or elsewhere, installs it in the finished shaft and commissions it: load test, brakes, safety gear, governor, door locks and rescue device. Ask to witness the tests. At handover you get the VAT invoice (Mushak 6.3), the test report, wiring diagrams, the manual rescue procedure, keys, a maintenance log and the warranty with its start date.

What we check for this order

  • Trade licence and import documentsThe seller's trade licence and IRC, and the import papers for the lift quoted, including origin and model.
  • Brand authorisationThe seller is authorised to sell, install and service the make, or the origin of machine and controller is stated plainly.
  • Spare parts and serviceWho holds parts in Bangladesh, how many technicians cover your city and the call-out time for a trapped passenger, in writing.
  • Warranty in writingPeriod from handover, the free maintenance period, what is covered, and exclusions such as voltage damage, vandalism or water in the pit.

Questions buyers ask

Will the lift work during load shedding?

With an automatic rescue device, the car moves to the nearest floor and opens its doors when power fails, so nobody is trapped. To keep running through a cut, the lift needs generator backup sized for its motor and starting current; we check your generator with the seller.

Machine room or machine-room-less lift?

A machine-room-less lift puts the machine in the shaft, saves the roof room and suits tight plots and mid-rise buildings. A machine room gives easier access for service and cooling, and often suits heavy goods lifts. Decide early: it changes the shaft, roof structure and civil works.

What should we test before accepting a new lift?

Watch the seller test the brakes with 125% of rated load, plus the safety gear, overspeed governor, buffers, door reopening, alarm, intercom and rescue device. Check stopping accuracy at every floor; EN 81-20 sets ±10 mm. Keep the signed report with the warranty.

How do I compare two lift quotes?

Check they price the same capacity, speed, stops, door width, car finish, machine and controller, rescue device and installation, and note the civil works each excludes. Then add maintenance after the free period. A cheaper quote often assumes you pay for scaffolding, pit work or power.

Can our old lift be modernised instead of replaced?

Often, yes. If the shaft, rails and car frame are sound, the seller replaces the controller, drive, machine, doors and car interior, sometimes in stages, for less cost and downtime than a new lift. Ask for a survey listing what stays and how long the lift is out of service.

How soon will I hear back about lifts and elevators?

Within 48 hours of a complete requirement, with a price and a delivery date. A requirement is complete when it has the model or specification, where it is needed and by when.

Who do I deal with?

With Roptan, when Roptan manages the order: we buy from the verified seller and deliver to you. With the supplier directly, when you post on the requirement board and choose a quote yourself.