Managed sourcing from Bangladesh, for export and for buyers at home
Get it sourced

Machinery and handling

Industrial rack supplier in Bangladesh

Need an industrial rack supplier in Bangladesh who quotes per pallet position, with design and installation included? Send the floor plan, pallet weights and forklift. We source racking, shelving or a mezzanine from verified sellers, check the design and have the seller install it.

  • Verified sellers
  • Checked before it ships
  • Delivered by Roptan

Get industrial racks sourced

Prefer to deal with suppliers yourself? Post it on the requirement board

Industrial rack products

Pick a product and we source it for you, or send one requirement that covers several.

Buying industrial racks in Bangladesh

Racking stores fabric rolls, yarn, cartons and finished goods in warehouses in Gazipur, Savar, Ashulia and Narayanganj, and in pharma, retail and cold store stock around Dhaka and Chattogram (Chittagong). Buyers are warehouse and factory managers, logistics firms and developers. A rack is a load-bearing structure: price per pallet position matters, but so do the design, the steel thickness and what happens when a forklift hits an upright.

An industrial rack supplier in Bangladesh should design to your loads, floor slab and forklift, not sell from a catalogue: racks fail through overloading, weak floors and damaged uprights. Send the layout, loads and forklift details by form or chat. We source local or imported racking from verified sellers, compare offers on cost per pallet position on one design basis, check the calculation and steel, and arrange installation through the seller. You deal with Roptan only.

Industrial racks we source

Selective pallet racking

Upright frames and beam pairs that give direct access to every pallet, the standard choice for mixed stock and first in, first out. Price per position is low, but aisles take floor space.

Drive in racking

Lanes the forklift drives into, storing pallets several deep on rails. It holds many more pallets per square metre for large quantities of one product, but works last in, first out, and impact damage is more common.

Mezzanine floors

A steel platform that adds a floor inside a tall building for storage, packing or offices, priced per square metre by floor load. State the load in kg per square metre, deck type, stairs and a loading gate, and check the slab under each column.

Cantilever racking

Arms on central columns with no front uprights, so long loads such as pipe, steel bar, timber, profiles and fabric rolls load from the side. Capacity is stated per arm and per column; ask for hot-dip galvanising outdoors.

Shelving racks

Boltless or slotted angle shelving for cartons, spares, accessories and files loaded by hand. Give shelf size, load per shelf level and number of levels. It is the low-cost option; check the steel thickness against the stated load per shelf.

Mobile racking

Racks on motorised bases on floor rails, opening one aisle at a time. It stores far more in the same room, which suits cold stores and archives, but costs more per position and needs a level floor for the rails and power during load shedding.

What to tell an industrial rack supplier in Bangladesh

Pallet and load
Pallet size, such as 1200 × 1000 mm or 1200 × 800 mm, height with load, and the heaviest weight in kg including the pallet.
Building and floor
Clear height to the lowest beam, light or sprinkler head, column grid, and slab thickness and grade. Upper floors need a structural engineer's check.
Forklift and aisle
Truck type, maximum lift height and right-angle stacking aisle. A counterbalance truck needs a wider aisle than a reach truck; choose racking and forklift together.
Layout and stock flow
A drawing showing columns, doors, fire exits, drains and sprinklers, pallet positions needed now and later, and whether stock leaves first in, first out or last in, first out.
Finish and flooding
Powder coating suits dry indoor stores; hot-dip galvanising suits cold rooms, damp ground floors and coastal sites near Chattogram or Mongla. Where the store floods, set the lowest beam above the flood line.
Seismic zone and accessories
The site's seismic zone under BNBC 2020, since tall racking in higher zones needs earthquake design, and the upright protectors, row end guards, mesh decks and pallet supports you want, so every quote includes them.
Commercial terms
Delivery and installation, VAT, payment stages, design drawings and the structural and finish warranty you expect, so offers compare like for like.

Racking standards, inspection and handover papers

EN 15512
Structural design of adjustable pallet racking. Ask for the design calculation or load tables for your beam spans, levels and frame heights, not a brochure rating.
EN 15620
Tolerances, deformations and clearances for adjustable pallet racking. Use it at installation to check plumb, beam levels and the gaps around each pallet.
EN 15635
Use and maintenance of storage equipment: load notices on every run, regular visual checks and an expert inspection at least every 12 months, with damage graded green, amber or red.
EN 16681
Seismic design of adjustable pallet racking. Ask for it, or an equivalent, where the site's BNBC 2020 seismic zone calls for earthquake loads on tall racking.
BNBC 2020
Covers the building: slab capacity for rack point loads, mezzanine structure, seismic design and, under Part 4, fire protection, since tall racks affect sprinklers and exits.

What moves the price of industrial racking

  • Steel weight: higher loads, taller frames and longer beams need heavier sections, and steel prices follow the market and exchange rate.
  • Finish: hot-dip galvanising costs more than powder coating but lasts longer in damp or salty air.
  • System type: drive in, mobile racking and mezzanines cost more per position or per square metre than selective racking, but hold more.
  • Accessories: guards, mesh decks, signs and anchors add cost and reduce damage.
  • Scope: design calculation, slab check, delivery, installation and anchors, which some quotes leave out.

Lead times and delivery

Standard shelving is often in stock and delivers within a week. Pallet racking fabricated in Bangladesh typically takes three to six weeks after you approve the layout; galvanised, imported, mobile and large mezzanine systems typically take eight to twelve weeks. Installation runs from days to weeks by size, and a slab check or layout change adds time. Roptan confirms dates in the quote.

The seller delivers to your warehouse in Dhaka, Gazipur, Chattogram or elsewhere, installs to the approved layout, anchors every upright, fits beam safety locks and checks plumb and beam levels against EN 15620. At handover you get the VAT invoice (Mushak 6.3), the as-built layout, design calculation and load tables, load notices on each run and the warranty in writing, with a walk-through on safe loads and reporting damage.

What we check for this order

  • Trade licence and import documentsThe seller's trade licence and, for an imported system, the IRC and import papers for the racking quoted.
  • Brand authorisation or stated originThe seller is authorised for an imported system, or local fabrication and the steel source are stated plainly.
  • Spare parts and serviceWhether matching uprights, beams and locks in the same profile are held in Bangladesh, so repairs and extensions stay compatible.
  • Warranty in writingPeriod, cover for steel, welds and finish, and what voids it: overloading, forklift impact or unapproved changes, written into the quote.

Questions buyers ask

Can racking go on an upper floor?

Only after a structural engineer checks the slab. Racking concentrates weight on small base plates, and a full bay can exceed what a floor was designed to carry. Send the floor's design load or the building drawings; the seller designs base plates and bay loads to suit.

Selective or drive-in racking?

Selective racking gives direct access to every pallet and suits mixed stock. Drive-in racking stores more pallets per square metre but works last in, first out, so it suits large quantities of few products. For first in, first out in dense storage, ask about drive-through racking.

How do I compare racking quotes from different sellers?

Put them on cost per pallet position at the same capacity per level, height, finish and scope, then compare upright and beam sizes and steel thickness from the drawings. A low price per bay can hide thinner steel, fewer levels or missing installation; a price per tonne says nothing about safe load.

How often should racking be inspected?

Regular visual checks by trained staff and an expert inspection at least every 12 months, as EN 15635 describes. Red-graded damage means unload that section at once. Report forklift strikes the same day, and replace damaged uprights rather than straighten them.

Can I add beam levels or move racks later?

Usually, if the uprights were designed for the new loads and heights. Moving a beam level changes the frame's capacity, so ask the seller to re-check the design and issue new load notices before anything is moved or added. Never move beams on a loaded bay.

How soon will I hear back about industrial racks?

Within 48 hours of a complete requirement, with a price and a delivery date. A requirement is complete when it has the model or specification, where it is needed and by when.

Who do I deal with?

With Roptan, when Roptan manages the order: we buy from the verified seller and deliver to you. With the supplier directly, when you post on the requirement board and choose a quote yourself.