Managed sourcing from Bangladesh, for export and for buyers at home
Get it sourced

Electrical and electronics

Electronic component manufacturer in Bangladesh

Looking for an electronic component manufacturer in Bangladesh? Send drawings, BOM, quantities and your market's standards. We source PCB assemblies, LED parts, ICs and devices from verified makers and authorised channels, check traceability, first articles and test records, and deliver or ship.

  • Verified sellers
  • Checked before it ships
  • Delivered by Roptan

Get electronic components sourced

Prefer to deal with suppliers yourself? Post it on the requirement board

Electronic component products

Pick a product and we source it for you, or send one requirement that covers several.

Buying electronic components in Bangladesh

Bangladesh assembles mobile phones, printed circuit boards, LED lighting parts and computer accessories, mostly from imported chips and parts, so a quote is mainly the bill of materials plus assembly, test and freight. Importers abroad buy finished devices and contract PCB assembly. At home, phone and appliance brands, lighting makers and IT distributors in Dhaka and Gazipur buy in volume.

Electronics buying carries two risks: parts that are not what the label says, and boards that pass a quick look but fail in use. Roptan places your build with a verified electronic component manufacturer in Bangladesh, checks component traceability, first articles and test records, and delivers locally or ships from Dhaka or Chattogram (Chittagong). You deal with Roptan only, or post the requirement on our board.

Electronic components we source

Semiconductor storage media

USB flash drives, memory cards and solid-state drives built on NAND flash and a controller. Specify true capacity, interface, sustained read and write speed and endurance; fake capacity and recycled flash are known risks.

PCB assemblies

Boards built to your Gerber files, BOM and placement data by surface-mount reflow and through-hole soldering, with optical inspection, X-ray where BGAs are used, in-circuit and functional tests, and conformal coating for humid use.

LED components

SMD LED packages, strips, modules and drivers for lighting makers. Specify package size, flux, colour temperature and CRI bins, forward voltage bin, and for drivers ripple and surge rating. Ask for LM-80 lumen maintenance data behind any life claim.

Integrated circuits

Microcontrollers, memory, power and interface ICs, in trays or on reels, or programmed with your firmware. Buy only with traceability to the original maker or an authorised distributor, with date codes and lot numbers; counterfeit and re-marked parts are the main risk.

Mobile devices

Smartphones, feature phones and tablets assembled from imported kits, under the maker's brand or yours. Specify network bands for your market, battery capacity and safety, SAR report, software and language.

Computer accessories

Keyboards, mice, chargers, power banks, USB cables and hubs, often private label. Specify connector type and power rating, and safety reports for chargers and power banks, which carry the most safety risk.

How to brief an electronic component manufacturer in Bangladesh

Files and revision
Send Gerber files, a BOM with maker part numbers and approved alternates, placement data, drawings and the revision letter. Mixed revisions and missing part numbers cause wrong builds and slow quotes.
Volumes and sourcing model
Pilot quantity, first order and yearly volume, and turnkey, where the maker buys all parts, or consigned, where you supply some. Setup and tooling are spread over volume.
Approved parts and channels
Say which parts may be substituted and who approves, and require parts from the original maker or authorised distributors.
Moisture and ESD
Humidity in Bangladesh matters: ask how moisture-sensitive parts are dry-packed, tracked and baked, and for ESD-controlled handling to IEC 61340-5-1.
Test plan
Define optical inspection, X-ray, in-circuit, functional and burn-in tests, the fixtures and who pays for them, and the pass criteria. Untested boards move the failure to your customer.
Market compliance
State where the product will be sold: EMC, RoHS, radio, SAR and battery approvals differ by market.

Workmanship standards, tests and compliance

IPC-A-610 and J-STD-001
Acceptability of electronic assemblies, and the soldering requirements behind it. Agree the class in the order and inspect to it.
J-STD-020 and J-STD-033
Moisture sensitivity levels for surface-mount parts, and how to pack, store and bake them. Ask how the line tracks floor life.
IEC 62368-1
Safety of IT and audio-video equipment, including chargers and adaptors. Ask for the report on the exact model and power rating.
IEC 62133-2 and UN 38.3
Safety and transport tests for the lithium batteries in phones, tablets and power banks. Without the UN 38.3 test summary, carriers can refuse the goods.
RoHS 2011/65/EU, REACH and the Radio Equipment Directive
Restricted substances, declarations on substances of very high concern, and radio approval under 2014/53/EU for EU-bound devices.
BTRC type approval
Phones and other radio equipment sold in Bangladesh need type approval from the telecom regulator, BTRC.

What moves the price of an electronics order

  • Bill of materials: parts are usually most of the cost, and memory, processor and flash prices move with the market.
  • Board complexity: layer count, BGA packages, fine-pitch parts and double-sided assembly add machine time and inspection.
  • Workmanship and test: IPC class 3, X-ray, burn-in and full functional test add cost per board, and catch more faults.
  • Sourcing channel: authorised distributors cost more than broker stock but carry far less counterfeit risk.
  • Lot size: stencils, programming and test fixtures are one-time costs spread over the order.
  • Compliance and freight: safety, radio and battery tests per model, ESD packing and air freight.

Lead times and delivery

Standard accessories and stock items are often available within 2 to 4 weeks. PCB assembly samples and first articles typically take 2 to 4 weeks once parts are in hand, and bulk runs 3 to 8 weeks from approved files and a full kit. Chips with long factory lead times, new test fixtures and market certification add time, sometimes months for a new device. Roptan confirms dates and any minimum order in the quote after checking parts availability.

Inside Bangladesh we deliver to factories, warehouses and offices in Dhaka, Gazipur, Chattogram and elsewhere, in ESD-safe and moisture barrier packing where parts need it. Boards come with test records by serial or lot, and reels and trays are counted against the packing list. You receive the certificate of conformance, traceability records where ordered, the warranty and a VAT invoice (Mushak 6.3).

Buying electronic components for export

For importers we quote FOB Chattogram for sea freight, or FCA Hazrat Shahjalal International Airport, Dhaka, for small, high-value lots by air. Devices with lithium batteries ship under UN 3481 with the UN 38.3 test summary. Documents: commercial invoice, packing list, bill of lading or air waybill, certificate of origin, a REX statement on origin for EU GSP, test reports, RoHS and REACH declarations, and AQL inspection reports to ISO 2859-1.

What we check for this order

  • Trade licence, ERC and approvalsCurrent, in the name on the quote, with BSTI or BTRC approval where the product requires it for sale in Bangladesh.
  • Test records for the build quotedFirst article report, test yields and functional, reliability and compliance reports for the exact revision, from the factory lab or an accredited third party.
  • Component traceabilityProof that ICs, memory and flash come from the original maker or an authorised distributor, with lot and date codes per build.
  • A visit to the line and written warrantyBefore the order we see SMT, inspection, test stations, ESD control and moisture storage, and get workmanship warranty terms in writing.

Questions buyers ask

How do I check a flash drive or memory card has its stated capacity?

Write the whole device with test data and read it back: fake-capacity devices report a large size but overwrite data once the real flash is full. Also measure sustained write speed with a large file against the stated class. We run these checks on samples from each lot.

Which IPC class should I order for a PCB assembly?

Class 2 suits most consumer and industrial products. Choose class 3 when failure is unacceptable, as in medical or safety equipment, and expect a higher price and more inspection. Class 1 suits simple, low-cost goods. Put the class in the order, not only in conversation.

How do I compare PCB assembly quotes, and can I supply my own parts?

Split each quote into parts, assembly per board, one-time tooling and test, and check the BOM was priced with the same part numbers, channels and volume; a low quote often uses broker parts or skips a test. Consigned builds, where you ship some parts, are common: the maker charges for assembly and test plus a small attrition allowance for placement losses.

Why does humidity matter in electronics assembly?

Plastic IC packages absorb moisture from humid air. In reflow, that moisture turns to steam and can crack the package or lift pads. Moisture-sensitive parts are kept dry-packed, their floor life tracked under J-STD-033, and baked when exposed too long. Ask the line how it does this.

Do phones assembled in Bangladesh need approval before sale abroad?

Yes, in most markets. Radio, EMC, safety, SAR and battery approvals depend on the market and must cover the final model and software; in the EU that is the Radio Equipment Directive. BTRC approval covers sale in Bangladesh only. We check which reports the seller holds and which must be added.

How soon will I hear back about electronic components?

Within 48 hours of a complete requirement, with a price and a delivery date. A requirement is complete when it has the quantity, where it is needed and by when.

Who do I deal with?

With Roptan, when Roptan manages the order: we buy from the verified seller and deliver to you. With the supplier directly, when you post on the requirement board and choose a quote yourself.