Gas fired boiler supplier in Bangladesh

Roptan works as your gas fired boiler supplier in Bangladesh for steam and hot water. Send the load, pressure and gas connection details: we source boiler and burner from verified sellers, check the burner and Boiler Act papers, and deliver to site.

  • Verified sellers
  • Checked before it ships
  • Delivered by Roptan

Get gas fired boilers sourced

Prefer to deal with suppliers yourself? Post it on the requirement board

Buying gas fired boilers in Bangladesh

A gas fired boiler burns natural gas in a forced draught burner to raise steam or heat water. Gas firing is a fuel and burner choice rather than a separate design, so a fire tube shell or a water tube boiler can take it. Textile mills audit their steam boilers and thermic fluid heaters as separate systems.

A gas fired boiler supplier in Bangladesh should start with your connection: the distributor, the load approved and the pressure at the meter. Roptan sources boiler and burner from verified sellers, checks the burner standard and the registration papers, and delivers; the seller erects and commissions it. You deal with Roptan only.

Kinds of gas fired boiler

Gas fired fire tube boilers

The burner fires into the furnace tube of a water-filled shell. Stored steam helps with batch loads at moderate pressure; the burner is bought to its own standard.

Gas fired water tube boilers

Water in tubes around the flame raises steam quickly from less water, and the design is generally preferred at high pressure. Its firing system falls under EN 12952-8.

Gas fired hot water boilers

Heat water without raising steam. Whether a unit must be registered depends on whether it falls under the Act's definition of a boiler, so confirm with the Chief Inspector's office for your unit.

Condensing gas boilers

Cool the flue gas far enough to condense its water vapour and recover that latent heat too. Flue-side parts must stand acid condensate, or they corrode.

How to brief a gas fired boiler supplier in Bangladesh

Gas connection
Whether you have one, the distributor, the approved load and the pressure at the meter. If you are still applying, get load and pressure approved before ordering.
Burner
Forced draught gas burners are built to EN 676. Ask for the burner's rated range against the boiler's full and low load.
Output
Steam in kg/h at working pressure, or hot water in kW with flow and return temperatures, plus peak and average demand.
Efficiency basis
For natural gas, gross calorific value is about 11 percent above net, so a net-based figure reads several points higher. Fix one basis for every quote.
Heat recovery
Ask for the flue gas exit temperature and the economiser material; running below the acid dew point needs materials chosen for it.
Water and blowdown
A make-up water test, since untreated water scales and overheats the tubes. Ask for automatic blowdown on conductivity: too little causes carry-over, too much wastes heat.

Burner, firing and boiler papers

EN 676
Forced draught burners for gaseous fuels. Ask which edition the burner is built to, and for its rated output range.
EN 12953-7 or EN 12952-8
Firing systems for liquid and gaseous fuels, for shell and water tube boilers. They cover the boiler's firing system as a whole, beyond the burner alone.
Boiler Act 2022 registration
A gas fired steam boiler is registered with the Office of the Chief Inspector of Boilers; the certificate lasts at most one year, renewable.
Recognised code and inspection body
An imported boiler must be built to a code and under an inspection body the Boiler Board recognises, with that body's certificate.

What moves the price of a gas fired boiler

  • Pressure and design: higher pressure needs a thicker vessel and, at the top end, usually a water tube boiler.
  • Heat recovery: an economiser or condensing section adds cost and saves gas; condensing duty needs acid-resistant materials.
  • Gas tariff: BERC raised prices for new industries by about a third on average in April 2025, as reported, so gas weighs more in running cost.
  • Controls and water: automatic blowdown and water treatment cost more at the start and cut losses of heat, water and chemicals.

Lead times and delivery

The gas connection can set the date, not the boiler. New industrial connections outside economic zones and industrial parks were stopped from April 2021 and, as reported, resumed in April 2025 with priority to export-oriented factories and EPZs. Apply early and get load and pressure approved before ordering. An imported boiler also waits on the Chief Inspector's prior approval to import. Roptan confirms dates and any minimum in the quote.

We deliver to your site. The seller sets the boiler, fits the burner and gas train to your approved connection, tunes and commissions it and trains your operator. Papers at handover: burner and firing system documents, code and inspection certificates, material certificates, the commissioning record and a VAT invoice (Mushak 6.3).

What we check for this order

  • Gas approval in handWe ask for the distributor's approval of load and pressure before ordering, so the boiler does not sit idle.
  • Burner to EN 676We check that the burner is built to EN 676 and that its rated range covers the boiler's full and low load.
  • Code and import approvalWe check that code and inspection body are Boiler Board recognised, and ask for the Chief Inspector's prior approval to import.
  • Efficiency on one basisWe put every seller's efficiency on one calorific value and one method, so the quotes compare.

Questions buyers ask

Can a new factory get a gas connection for a boiler?

It depends on location, priority and the distributor. A 2020 circular stopped new industrial connections outside economic zones and industrial parks from April 2021; 368 applications were pending in October 2024, and connections were reported to resume in April 2025 with priority to export-oriented factories and EPZs. Ask the local distributor about your case, and get load and pressure approved before you order.

Is a gas fired boiler registered differently?

No. Registration under the Boiler Act 2022 follows the vessel, not the fuel: a gas fired steam boiler is registered with the Office of the Chief Inspector of Boilers before use and run by a licensed operator. For a hot water unit, confirm with the Chief Inspector whether yours must be registered.

Why do efficiency figures differ so much between quotes?

Often the basis, not the boiler. For natural gas, gross calorific value is about 11 percent above net, so a figure on net reads several points higher. The method matters too: direct (input-output) or indirect (heat loss). Ask every seller for the same basis, method and load.

Is a condensing gas boiler worth it?

It recovers the latent heat in the flue gas water vapour. The catch is acid condensate: below the acid dew point, flue-side parts corrode unless their materials are chosen for it. Ask the seller which materials it uses and judge its efficiency on gross calorific value.

How soon will I hear back about boilers?

Within 48 hours of a complete requirement, with a price and a delivery date. A requirement is complete when it has the model or specification, where it is needed and by when.

Who do I deal with?

With Roptan, when Roptan manages the order: we buy from the verified seller and deliver to you. With the supplier directly, when you post on the requirement board and choose a quote yourself.

Other boiler products

Each product type has its own page as it is published; until then its card opens the category form.

All boilers