Buying boiler parts in Bangladesh
Boiler parts fall into two groups. The Boiler Act 2022 names pressure parts and fittings as components of the boiler itself: plates, tubes, drums, furnace, stop, safety, blow-down and feed check valves, economiser and superheater among them. Burners and other non-pressure items sit outside that list. The difference decides who may fit a part and which papers it needs.
A boiler part supplier in Bangladesh should ask for your nameplate and registration number before quoting, since the part must match a registered boiler. Roptan sources from verified sellers, checks material and valve certificates, confirms the listed repairer who will fit pressure parts, and delivers. You deal with Roptan only.
What to send a boiler part supplier in Bangladesh
- Nameplate and registration number
- Serial, design code and pressure from the nameplate, and the registration number marked on the boiler, so the part matches the registered boiler.
- Photos and part numbers
- Photos of the part in place, and any drawing or part number from the maker's data book.
- Tubes and plates
- Material grade, outside diameter and wall thickness, matched to the code the boiler was built to.
- Valve data
- For safety valves, set pressure and inlet and outlet size; for other valves, size, pressure rating and end connection.
- Who fits it
- Name your listed repairer, or ask us to arrange one through the seller. The user must notify the Chief Inspector in writing before a repair.
Repair rules and part certificates
- Boiler Act 2022, section 24
- A repair needs written notice to the Chief Inspector, work to the code, a listed repairer and inspection at stages. A repair outside these rules is a ground to cancel registration.
- EN 10204 type 3.1 or 3.2
- Material certificates for pressure parts: 3.1 from the maker with test results, 3.2 with an independent inspector's sign-off as well.
- ISO 4126-1
- Safety valves. Ask for each valve's certificate showing its set pressure.
- EN 12953-5 and EN 12952-6
- Inspection during construction, documentation and marking of pressure parts, for shell and water tube boilers. Ask for it when a new pressure part is made.
Lead times and delivery
Time depends on whether the part is held in Bangladesh or has to be made or imported. An imported pressure component may need the Chief Inspector's prior approval; ask Roptan to confirm before ordering. A repair also waits on the written notice and the stage inspections the Act requires. Roptan confirms dates and any minimum in the quote.
We deliver parts to your site with their certificates. Pressure parts and safety devices are fitted by a listed repairer, arranged through the seller where you need one, with the Chief Inspector notified first. Papers: material and valve certificates, the repair record where the part is fitted, and a VAT invoice (Mushak 6.3).
Questions buyers ask
Can my own maintenance team change boiler tubes?
Only as a repair under the Act. The user notifies the Chief Inspector in writing, the work follows the code, a repairer on the Chief Inspector's list does it, and it is inspected at stages. A repair outside these rules can lead to the boiler's registration being cancelled.
Do I need approval to import boiler parts?
Possibly. Prior approval of the Chief Inspector of Boilers is required to import boilers and boiler components, but whether that covers every part or only pressure components is not clear. Confirm with the Chief Inspector's office before you order, and tell us the part so we can ask the seller too.
What should I send to get a quote?
Nameplate data, the registration number marked on the boiler, photos of the part in place and any part number from the maker's data book. For tubes add grade, diameter and wall thickness; for safety valves, set pressure and size. With these we can ask sellers for a like-for-like part.
Which spares are worth holding?
Water-side spares often pay their way. The Act bars use of a boiler whose water is outside the rules and code, and untreated water causes scale, corrosion and overheating. Dosing pumps, conductivity probes and blowdown valves keep treatment and blowdown running; blowdown typically takes 4 to 8 percent of feed water flow.
How soon will I hear back about boilers?
Within 48 hours of a complete requirement, with a price and a delivery date. A requirement is complete when it has the model or specification, where it is needed and by when.
Who do I deal with?
With Roptan, when Roptan manages the order: we buy from the verified seller and deliver to you. With the supplier directly, when you post on the requirement board and choose a quote yourself.