Buying screw compressors in Bangladesh
A screw compressor traps air between two meshing helical rotors and squeezes it as they turn. The flow is steady, the machine runs quieter than a piston unit, and it needs no special foundation. The oil-injected, motor-driven screw has become a dominant industrial type. Bangladesh exports few air compressors, so this page is for buyers here.
Screw quotes rarely compare as sent, because each seller states flow and power on its own basis. As your screw compressor supplier in Bangladesh, Roptan asks verified sellers for flow and power at your pressure on the ISO 1217 basis, checks the machine and its papers, and delivers it. The seller installs and commissions it.
What to tell a screw compressor supplier in Bangladesh
- Flow at your pressure
- Free air delivery in m³/min at the working pressure. A flow figure without a pressure tells you nothing.
- Working pressure
- What your furthest machine needs plus pipe and filter losses. Near 7 bar, every 0.14 bar added raises energy use by about 1 percent at full flow.
- Demand pattern
- A week's log of demand. A swinging load favours a variable speed screw, or several smaller machines in sequence, over one large fixed speed unit.
- Leaks before sizing
- Poorly kept systems can lose 20 to 30 percent of output through leaks; good upkeep brings that under 5 to 10 percent. Repair first, then size.
- Dust, lint and humid air
- A dirty intake filter cuts capacity and fouled coolers waste power, so plan cleaning in dusty rooms or mills with lint. Order dryer and drains with the screw.
- Heat recovery
- More than 80 percent of the electricity a compressor takes becomes usable heat. Ask the seller to price recovery for hot water or warm air.
Standards and test papers for screw compressors
- ISO 1217
- Acceptance tests for flow and power of displacement compressors; Amendment 1 of 2016 added specific energy. Ask for the model's test data on this basis.
- ISO 11011
- How a whole-system compressed air energy assessment is done and reported. Ask for one before replacing a machine.
- EU Machinery Directive 2006/42/EC
- Machines from EU sellers carry CE marking under it. Regulation (EU) 2023/1230 replaces it from 20 January 2027, so check which one the declaration names.
- Bangladesh Labour Act 2006, section 71
- Your factory must take the measures needed so pressure plant never exceeds its safe pressure: a duty on the plant, not an approval of the machine.
Lead times and delivery
We found no reliable published lead time for screw compressors here, so we give no figure. A common oil-injected size a seller already holds usually arrives sooner than a variable speed, two-stage or oil free machine shipped to order, which waits on sea freight and customs. Roptan confirms dates and any minimum in the quote.
We deliver to your plant anywhere in Bangladesh. The seller sets the screw where it gets cool air, connects power, receiver, dryer and drains, and commissions it. At handover, ask for the test data sheet, a commissioning record, the service schedule, the warranty and a VAT invoice (Mushak 6.3).
Questions buyers ask
When is a screw better than a piston compressor?
When air runs for long hours. A screw gives steady flow with less noise and vibration. For very small duties a piston machine often suits better: leakage between small rotors makes small screws less efficient, and piston units work more efficiently at part load.
Is a variable speed screw compressor worth it for my plant?
Only if your demand varies. Efficiency peaks when the drive spends most hours between about 30 and 80 percent speed; near full output, drive losses make it use more power than a fixed speed machine. A week of logged demand settles it.
How much power does a screw compressor use?
It depends on size, stages and pressure. A US sourcebook's indicative figures at 100 psig are 16 to 19 kW per 100 cfm for single-stage oil-injected screws and 15 to 17 for two-stage. Ask for the model's tested figure.
What does a screw compressor need in servicing?
A clean intake filter, oil and oil filter on the maker's schedule, a separator changed at its pressure drop limit, and clean coolers. A clogged separator makes the motor draw more power.
How soon will I hear back about air compressors?
Within 48 hours of a complete requirement, with a price and a delivery date. A requirement is complete when it has the model or specification, where it is needed and by when.
Who do I deal with?
With Roptan, when Roptan manages the order: we buy from the verified seller and deliver to you. With the supplier directly, when you post on the requirement board and choose a quote yourself.