Managed sourcing from Bangladesh, for export and for buyers at home
Get it sourced

Machinery and handling · Cranes and hoists

Overhead EOT crane supplier in Bangladesh

Tell Roptan what the crane lifts, the span between the rails and how often it works. As your overhead EOT crane supplier in Bangladesh, we source from a verified seller, check the design and test papers, and arrange erection through the seller.

  • Verified sellers
  • Checked before it ships
  • Delivered by Roptan

Get overhead EOT cranes sourced

Prefer to deal with suppliers yourself? Post it on the requirement board

Buying overhead EOT cranes in Bangladesh

An overhead EOT (electric overhead travelling) crane is a bridge that travels on rails along a shed, with a hoist and trolley crossing it, so the hook reaches most of the bay. Steel fabricators, mills, power stations, machine shops and warehouses in Bangladesh use them to feed machines, move coils and stack heavy stock.

An overhead EOT crane supplier in Bangladesh will often quote the crane alone, yet the runway, power feed and shed decide whether it works. Roptan turns your load, span, duty and shed drawing into one enquiry, sources from a verified seller and checks the papers. The seller erects, tests and commissions the crane.

Kinds of overhead EOT crane

Single-girder EOT cranes

One girder carries the hoist and trolley. It is the most widely used layout and uses less steel, so the crane weighs less. Choose it for lighter loads and moderate spans.

Double-girder EOT cranes

Two girders carry the trolley between them, for much heavier loads and wider spans. Choose it when your load or span is beyond a single girder.

Top-running cranes

End carriages run on rails on top of runway beams carried by the building columns. This is usually the standard shed arrangement.

Underhung (suspended) cranes

The crane hangs from runway beams fixed to the roof structure, leaving the floor and columns clear. Hanging from the roof usually lowers the maximum load.

Pendant, remote and cabin control

Most EOT cranes run from a pendant or a radio or infrared remote. Under the US overhead crane rule, a cabin must give the operator a full view of the hook.

How to specify an overhead EOT crane

Safe working load
State the heaviest load plus anything hung below the hook, such as a spreader beam or magnet, and the safe working load to be marked.
Rail centres, hook height and runway
Give the rail centre distance, hook height and runway length, with a shed drawing showing columns, truss level and obstructions.
Duty class
State lifts per hour, shifts per day and how often loads come near capacity. Sellers grade this as a CMAA class, usually A for standby or infrequent use to F for continuous severe service, or a group under ISO 4301-5:2025.
Columns and runway beams
Have a structural engineer check the columns and runway beams against the wheel loads and braking forces the seller states, before you order.
Heat and damp
Summer maxima usually reach 38 to 41 degrees C and the monsoon brings about 80 percent of the year's rain. Ask for the IP rating and insulation class of motors and panels in writing.

Law, tests and papers for an EOT crane

Labour Act 2006, section 68
A thorough examination by a competent person at least once in every twelve months, a register and a marked safe working load. Where someone works on or near its wheel track and could be struck, measures must keep a travelling crane six metres from that place.
ISO 4310:2009 crane test code
Ask the quote to name test loads, method and witness. A US federal rule caps test loads at 125 percent of rated load unless the maker advises otherwise: US practice, not Bangladesh law.
Design file, section 76
An inspector may ask for drawings, specifications and strength tests. Keep the calculations and signed test report on site.

What moves the price of an overhead EOT crane

  • Safe working load and span: they set the girder depth, the hoist size and the wheel loads.
  • Single or double girder: a single girder uses less steel.
  • Duty class: a crane rated for frequent lifts near capacity is built heavier throughout.
  • Hook height and runway length: more rope, rail and conductor.
  • Controls and drives: radio remote, cabin or inverter drives each add cost.
  • Outdoor or damp duty: storm locks, sealed enclosures and corrosion-resistant paint.

Lead times and delivery

There is no fixed delivery period for an EOT crane. It is built to order once load, span, duty and runway are frozen, so a late change moves the date. An imported crane adds sea freight and customs clearance at Chattogram, and erection waits until the runway, rails and power are ready. Roptan confirms the dates and any minimum order in the quote.

The seller usually checks the runway and rails against the building, lifts the bridge into place, sets the limit switches and brakes, and runs the load test before handover. You receive the test report, the rated load marked on the crane, the manual, spare parts list, warranty and a Mushak 6.3 VAT invoice. Roptan delivers anywhere in Bangladesh.

What we check for this order

  • Runway fitWe check the seller has your shed drawing and confirms rail span, column loads and clearances before fabrication starts.
  • Duty class in writingWe check the quote states the duty class or group against your lifts per hour, so the crane is not rated below its work.
  • Safety devicesWe check the items the US overhead crane rule lists: hoist brakes that apply on power loss, trolley travel stops and the rated load marked on each side.
  • Load test papersWe check the test load, method and witness are in the quote, and that the signed report comes with the crane.

Questions buyers ask

Should I choose a top-running or an underhung EOT crane?

Top-running is usually the choice when the columns can carry runway beams. Underhung cranes hang from the roof and keep the floor clear, but hanging from the roof lowers the maximum load, so they suit lighter work in sheds whose roof is designed for it.

What should an EOT crane enquiry include?

The load with lifting gear, span, hook height, runway length, lifts per hour, power supply, control type and the shed drawing. With these, every seller quotes the same crane and you compare like with like.

Does Bangladesh law require a 125 percent load test?

No. The Labour Act sets no test load figure; section 68 asks for a sound crane, a marked safe working load and a thorough examination at least once in every twelve months. The 125 percent cap is a US federal rule. Ask the seller to name the test load and the code.

Pendant or radio remote: which should I choose?

A pendant keeps the operator close to the load. A radio or infrared remote lets the operator stand back where the view is clear, which helps with long loads. A crane can carry both; the US rule asks that the buttons be clearly marked for their functions.

How soon will I hear back about cranes and hoists?

Within 48 hours of a complete requirement, with a price and a delivery date. A requirement is complete when it has the model or specification, where it is needed and by when.

Who do I deal with?

With Roptan, when Roptan manages the order: we buy from the verified seller and deliver to you. With the supplier directly, when you post on the requirement board and choose a quote yourself.

Other crane products

Each product type has its own page as it is published; until then its card opens the category form.

All cranes and hoists