Buying gantry cranes in Bangladesh
A gantry crane carries its bridge on legs that run on ground rails or wheels, so no building holds it up. Gantries serve fabrication, steel, scrap and precast yards, cement works and loading bays, and can run beneath an existing bridge crane. Most are outdoor machines, so heat, monsoon rain and storms shape the order.
A gantry crane supplier in Bangladesh may quote a span and a capacity and leave out the rails, foundation and storm anchoring. Roptan puts your load, clear span, rail length, ground and wind exposure into one enquiry, sources from a verified seller and checks the papers. The seller erects, tests and commissions the crane.
How to specify a gantry crane
- Clear span, not only span
- Overall span is the full bridge length; clear span is the distance between the inside faces of the legs. State the clear span your loads and yard lane need.
- Load and hook height
- Give the heaviest load with its slings and the hook height you need. Leg height follows from it and drives the steel weight.
- Rails and foundation
- Larger gantries usually run on rail set into the ground. On soft or wet ground the rail foundation needs a structural engineer's design.
- Wind and storm anchoring
- Ask for the in-service wind limit, assessed to ISO 4302:2016, and the out-of-service anchoring to ISO 12210:2021. Severe cyclones have struck Bangladesh repeatedly, so stowing must be planned.
- Duty
- State lifts per hour and hours per day. Frequent yard work usually needs a higher duty class than occasional shop use.
- Corrosion protection
- Near the coast or in damp yards, ask for a paint system chosen for the site's corrosion class and sealed enclosures for motors and panels.
Law, tests and papers for a gantry crane
- Labour Act 2006, section 68
- A gantry is a crane under the Act: examined by a competent person at least once in every twelve months, with a register, and its safe working load plainly marked and never exceeded.
- Six metres from the wheel track
- Section 68 also asks for measures that keep a travelling crane from coming within six metres of anyone working on or near its wheel track. Plan yard walkways around it.
- Acceptance load test
- Ask for the test load, method and witness in writing. A US federal rule caps test loads at 125 percent of rated load unless the maker advises otherwise: US practice, not Bangladesh law.
- Rail clamps and storm locks
- The US rule requires automatic rail clamps on outdoor storage bridges. Ask what holds your crane against wind, and on what basis.
Lead times and delivery
A rail-mounted gantry is built to order once span, capacity and rail are fixed, so a late change moves the date. Imported cranes add sea freight and customs clearance at Chattogram. Erection waits for the rail foundation, and foundation work on wet monsoon ground can take longer. Roptan confirms the dates and any minimum order in the quote.
The seller sets the rail to its tolerances, erects the legs and bridge, fits the anchoring and limit switches, then runs the load test. You receive the test report, the safe working load marked on the crane, the manual, spares list, warranty and a Mushak 6.3 VAT invoice. Roptan delivers across Bangladesh.
Questions buyers ask
Full gantry or semi-gantry: which suits my site?
A full gantry needs no building, so it suits open yards and long stock lines. A semi-gantry rides a runway on one side and saves floor space there; choose it where a strong wall or column line already runs along the work area and an engineer confirms it can carry the load.
Can a gantry crane work outdoors through the monsoon?
Yes, if it is ordered for it: sealed enclosures, a paint system chosen for the site, drained rail foundations and storm anchoring. A crane specified for a shed and set up in a yard will corrode and may not be held against wind.
Does a gantry crane need a foundation?
A rail-mounted gantry needs a rail on a foundation designed for its wheel loads; on soft or wet ground that is a structural engineer's job. Rubber-tyred and portable gantries run without rails but still need a firm, level surface.
What wind speed can a gantry crane work in?
It depends on the design. Ask the seller for the in-service wind limit, the out-of-service storm condition and the method used, plus a rule for stopping work. Your structural engineer gives the site's design wind speed.
How soon will I hear back about cranes and hoists?
Within 48 hours of a complete requirement, with a price and a delivery date. A requirement is complete when it has the model or specification, where it is needed and by when.
Who do I deal with?
With Roptan, when Roptan manages the order: we buy from the verified seller and deliver to you. With the supplier directly, when you post on the requirement board and choose a quote yourself.