Managed sourcing from Bangladesh, for export and for buyers at home
Get it sourced

Electrical and electronics · Industrial automation and drives

Soft starter supplier in Bangladesh

Need a soft starter supplier in Bangladesh? Send the motor nameplate, the load, the start time and how often it starts. We source a starter rated for that duty from a verified seller, check its rating and papers, and deliver to your plant.

  • Verified sellers
  • Checked before it ships
  • Delivered by Roptan

Get soft starters sourced

Prefer to deal with suppliers yourself? Post it on the requirement board

Buying soft starters in Bangladesh

A soft starter ramps up the voltage to an AC induction motor during start-up, usually through pairs of thyristors connected back to back, so the motor never takes full voltage at once. That limits the inrush current and the starting torque. Plants in Bangladesh fit soft starters on pumps, fans, compressors and conveyors that run at one speed once started.

A soft starter chosen by motor kW alone may not cope with a long or frequent start. As your soft starter supplier in Bangladesh, Roptan writes the load, start time and starts per hour into the order, sources from a verified seller, checks that the duty rating covers them and delivers. The seller or your panel builder installs and commissions it.

Kinds of soft starter

Three-phase controlled soft starters

Thyristors control all three phases, which gives more even motor currents than two-phase control. Choose this kind where balanced current in every phase matters.

Two-phase controlled soft starters

Thyristors control two phases and the third stays connected, so the uncontrolled phase always shows some current imbalance against the other two. Ask the seller how the model handles this.

Inside-delta soft starters

Connected inside the delta loop of a delta-connected motor rather than in series with the line. Tell the seller how your motor is wired, since it decides which connection is possible.

Air-core series reactor starters

A reactor in series with the motor limits starting current. It is common practice on pumps, compressors and fans, but high starting torque loads usually do not use this method.

Mechanical soft starters

Clutches and couplings that pass torque to the load through a fluid, magnetic forces or steel shot, instead of controlling the motor voltage. Ask the seller how the coupling is sized for your load.

How to brief a soft starter supplier in Bangladesh

Motor nameplate
Give kW, full-load current, voltage, and whether the motor is star or delta connected, since that decides in-line or inside-delta connection.
Starting current your supply accepts
Direct-on-line starting draws up to 7 to 10 times running current, and higher-efficiency motors 10 to 15 times. State what your utility connection or generator can accept.
Start time and load
Say how long the load takes to reach speed. A heavy fan usually takes longer than a light pump, and the starter's trip class and duty rating must allow that time.
Starts per hour
Give how many times an hour the motor starts. The limit depends on the duty and differs by model, so ask the maker's figure for yours.
What the start must protect
On pumps, a ramped start avoids pressure surges that lead to water hammer; on conveyors, jerk on drive parts; on belt-driven fans, belt slip.
Supply protection
A soft starter eases inrush but does not stabilise the supply. Ask for undervoltage and phase-loss protection where your supply swings.

Standards and ratings for soft starters

IEC 60947-4-2:2020
The product standard for semiconductor motor controllers, starters and soft starters up to 1,000 V AC, with Amendment 1:2024. Ask for the duty rating the maker declares under it.
IEC 61800-9-2:2023
Energy efficiency indicators that also cover motor starters. Ask for it only if you want a loss figure for the starter.

What moves the price of a soft starter

  • Motor rating: the starter is chosen on the motor's full-load current and voltage.
  • Duty: a long or frequent start usually calls for a larger starter than the motor kW alone suggests.
  • Control: three-phase or two-phase control, and in-line or inside-delta connection to the motor.
  • Construction: a thyristor starter, a series reactor or a mechanical coupling.
  • Protection, communication and enclosure: motor protection, network options, and a bare unit or one in its own enclosure.

Lead times and delivery

Common soft starter sizes may be in stock in Dhaka. Large units, reactor starters and specially rated models are usually imported or built to order, and a starter built into a panel takes longer than a bare unit. Roptan confirms dates and any minimum quantity in the quote.

We deliver the starter to your plant or panel builder anywhere in Bangladesh. The seller or your panel builder installs it, sets the ramp, current limit and motor protection from the nameplate, and test-starts the motor on load with your team. You receive the settings sheet, the wiring drawing, the maker's duty rating for the model, the warranty and a VAT invoice (Mushak 6.3).

What we check for this order

  • Duty rating against your startWe check that the starter's AC-53 duty rating and trip class cover your motor's starting current and start time.
  • Nameplate matchWe check that the starter's rated current and voltage match the motor nameplate and its star or delta connection.
  • Starts per hour in writingWe check the maker states the starts per hour for your duty, in writing, for the model quoted.
  • Supply protectionWe check that undervoltage and phase-loss protection is included or quoted, since the starter does not stabilise the supply.

Questions buyers ask

Soft starter, star-delta or drive?

All three reduce starting current. Star-delta is another reduced-voltage method; a soft starter ramps the voltage continuously and needs very few adjustments; a drive also sets the running speed. Choose a soft starter when the motor runs at one speed and a drive when speed must change.

How many times an hour can a soft starter start a motor?

It depends on the model and the duty. Makers publish a limit for each duty; in one maker's data, heavy duty allows half the starts of standard duty. Tell us the starts per hour and the start time, and we ask the seller for the figure in writing for the model quoted.

Do high-efficiency motors change the choice?

They can. On a direct start, higher-efficiency motors can draw 10 to 15 times running current, against 7 to 10 times for other induction motors. Give the motor's efficiency class with the nameplate, so the seller sizes the starter on the right starting current.

Does a soft starter help on a generator supply?

Usually. The high inrush of a direct start stresses the supply and may cause voltage dips, and a soft starter limits that inrush. Give the generator's kVA and the motor list, so the seller can check the starting current the set accepts.

How soon will I hear back about industrial automation and drives?

Within 48 hours of a complete requirement, with a price and a delivery date. A requirement is complete when it has the quantity, where it is needed and by when.

Who do I deal with?

With Roptan, when Roptan manages the order: we buy from the verified seller and deliver to you. With the supplier directly, when you post on the requirement board and choose a quote yourself.

Other industrial automation products

Each product type has its own page as it is published; until then its card opens the category form.

All industrial automation and drives