Managed sourcing from Bangladesh, for export and for buyers at home
Get it sourced

Machinery and handling · Industrial racks

Mezzanine floor supplier in Bangladesh

Roptan is a mezzanine floor supplier in Bangladesh for stores and factories that need more floor under the same roof. Tell us the area, use, load and clear height: we source from verified sellers, check the design and slab, and the seller installs it.

  • Verified sellers
  • Checked before it ships
  • Delivered by Roptan

Get mezzanine floors sourced

Prefer to deal with suppliers yourself? Post it on the requirement board

Buying mezzanine floors in Bangladesh

A mezzanine floor is a steel platform built inside an existing building to add a level for stock, packing, plant or offices. Industrial mezzanines are semi-permanent: usually free-standing, able to be dismantled and moved, and sold as commercial products. Prefabricated steel sheds and production buildings in Bangladesh already carry them, and factory inspections look at their load plans.

A mezzanine floor supplier in Bangladesh should design to the use you declare and the slab you actually have. Send the plan, use and load by form or chat: we source from verified sellers, compare offers on one design load and column grid, check the calculation and arrange installation through the seller. You deal with Roptan only.

Kinds of mezzanine floor

Custom mezzanines

Designed to the space and the load, with at least one stair, and usually the highest capacity. Choose it for heavy stock, plant, an awkward column grid or a large area.

Standard mezzanines

Self-supporting steel platforms sold in preset sizes and shapes, usually less expensive than custom ones. Choose it for a simple platform of ordinary size and load.

Rack-supported mezzanines

The deck sits on racking or shelving, which carries both levels. Choose it for a picking block that is being built anyway, with the racks designed for the upper load.

Office mezzanines

An upper level with enclosed, panelled offices over a store or production floor. Office use sets its own load, stairs and exits, so state it at the start.

What to tell a mezzanine floor supplier in Bangladesh

Use
Storage, packing and picking, plant or offices. The use sets the floor load, the stairs and exits, and the fire arrangement, so state it first.
Floor load
The heaviest stock per square metre, in kg. Inspection reports quote BNBC as setting at least 6 kN/m2 for light storage; state storage even if it is only occasional.
Area and clear height
Deck area and the clear height above and below. A mezzanine pays only where both levels keep working height.
Slab and footings
Slab thickness, concrete grade and any footing or soil data. Each column puts a point load on the floor, so a structural engineer or the seller's survey checks it.
Column grid and deck
Where columns may stand, the spans you want, and the deck material, which depends on span and use; fibre cement board is one option.
Stairs, gates and edges
Stairs, guardrails, toe boards and a pallet gate where goods are lifted up. US practice uses dual-gate pallet systems so one barrier is always closed.
Seismic zone
Published BNBC 2020 studies place Dhaka in seismic Zone II and Chattogram in Zone III; confirm your site's zone and ask which zone the frame and its bracing were designed to.

Codes, rules and papers for a mezzanine

BNBC 2020
The building code for loads, structure and seismic design in Bangladesh. Ask the seller to state the live load and seismic zone the frame was designed to.
Design basis
No standard written for free-standing mezzanines was found. Name a steel structures code, such as Eurocode 3 (EN 1993), with BNBC loads; EN 15512 applies where rack parts are the main members.
Load notice
UK practice fixes the load notice to a main beam on the floor's perimeter, showing the safe working load and instructions such as not altering the structure.

What moves the price of a mezzanine floor

  • Area and design load: more square metres and more kg per square metre mean more steel.
  • Deck, stairs and gates: the deck material and the number of stairs and pallet gates each add to the price.
  • Custom or standard: a design made for your space usually costs more than a preset standard size.
  • Base work and scope: column bases or footings, the slab check, drawings and installation, which some offers leave out.

Lead times and delivery

No fixed lead time applies. A mezzanine needs a design, a slab check and steel fabrication, so time depends on the area, load, deck and stairs, and any footing work the survey finds. Imported parts and changes after drawing approval add time. Roptan confirms the dates in the quote once the layout is agreed.

The seller delivers the steel and installs it to the approved drawing. One wrong floor fixing, levelling plate or brace can affect the whole structure, so we ask for named installers and a method statement. At handover you receive the VAT invoice (Mushak 6.3), as-built drawings, the calculation, the load notice in place and a written warranty.

What we check for this order

  • Declared use and loadWe check that the calculation uses your declared use and load per square metre, not an office load for a storage deck.
  • Slab under each columnWe check that the slab or footings under each column were assessed by a structural engineer or the seller's survey.
  • Gates and edges in the quoteWe check that stairs, guardrails, toe boards and pallet gates are priced in, not left as extras.
  • Papers with the floorWe check that drawings, the calculation and a load notice come with the floor, and that no beam is to be altered after handover.

Questions buyers ask

Can a mezzanine be moved later?

Usually, yes. Industrial mezzanines are semi-permanent: they can be dismantled and relocated, and their size and layout changed. A move means a new slab check at the new place, and a fresh design check if the span, load or use changes.

Is there a size limit for a mezzanine in Bangladesh?

Check with your structural engineer or the authority approving the building; this page does not quote a BNBC 2020 limit. As a comparison only, the US building code treats a mezzanine as part of the storey below if it covers no more than a third of the room.

Can an office mezzanine store stock later?

Only after the design is checked for the heavier load. An inspection report in Bangladesh found a mezzanine planned as an office at 5 kPa with storage in use, and asked for the load plan to be revised. If storage may ever happen, declare it at the start.

Should the mezzanine stand on the racking?

It can, if the racking is being built anyway and is designed for both levels; EN 15512 covers such floors where rack parts are the main members. For heavy plant, offices or racks not designed for the extra load, a freestanding frame suits better.

How soon will I hear back about industrial racks?

Within 48 hours of a complete requirement, with a price and a delivery date. A requirement is complete when it has the model or specification, where it is needed and by when.

Who do I deal with?

With Roptan, when Roptan manages the order: we buy from the verified seller and deliver to you. With the supplier directly, when you post on the requirement board and choose a quote yourself.

Other industrial rack products

Each product type has its own page as it is published; until then its card opens the category form.

All industrial racks