Managed sourcing from Bangladesh, for export and for buyers at home
Get it sourced

Machinery and handling · Garment and footwear machinery

Footwear making machine supplier in Bangladesh

Setting up a shoe line or adding a sole room? As your footwear making machine supplier in Bangladesh, Roptan matches the machines to your construction and daily pairs, sources the package from verified sellers, checks it and delivers.

  • Verified sellers
  • Checked before it ships
  • Delivered by Roptan

Get footwear making machines sourced

Prefer to deal with suppliers yourself? Post it on the requirement board

Buying footwear making machines in Bangladesh

Footwear making machines cut, close, last and sole a shoe, and the construction decides which a line needs: cemented, vulcanised, injection moulded or welted. Bangladesh exports leather, textile and rubber or plastic footwear, with leather-upper shoes the largest line on EPB figures for FY2025-26, while its own exports of footwear machinery are negligible. The machines come from abroad.

A line is bought as a package, often from several makers, so capacities must match. A footwear making machine supplier in Bangladesh should start from the shoe. Tell Roptan the construction, upper material, size run and pairs per day; we source from verified sellers, check the package and its papers, and deliver. The seller installs and commissions it.

Kinds of footwear making line

Cemented lines

The sole is glued to the lasted upper; sports shoes are a common example. The line needs lasting, cementing and sole-pressing machines.

Vulcanised lines

A rubber sole is cured onto the upper. Canvas shoes are the usual example.

Injection moulding lines

The sole is moulded on or to the upper. Sandals are a common example; moulds are made for each design.

Welted lines

A welt strip of leather, rubber or plastic around the outsole edge is stitched to the upper and insole. Ask whether welt stitching is in the package.

What to tell a footwear making machine supplier in Bangladesh

Construction
Name it first: cemented, vulcanised, injection moulded or welted. It decides most of the machines in the package.
Upper material
Say leather, textile or synthetic, and ask the seller to show which machines in the package are there for that material.
Size system and lasts
State the size system and size run, for example Mondopoint under ISO 9407, and the last measurements to ISO 19409. The machines are set to the last.
Pairs per day
Give the daily output in pairs for each shoe type, so cutting, closing, lasting and soling capacities match.
Stitching
Say whether stitching is upper closing or sole stitching. ISO 10821 covers the first; shoe bottom stitching machines sit outside it.
Moulds, dies and lasts
List the sole moulds, cutting dies and lasts needed per design and size, since they are made for each design and priced on top of the machines.

Tests and safety standards for footwear machines

ISO 17693 and ISO 17708
Tests on the shoe the line makes: ISO 17693 checks that an upper can be lasted without damage, ISO 17708 how well upper and outsole stay joined. Condition samples to ISO 18454.
ISO 10821
Safety of sewing machines for footwear and leather goods, covering upper closing but not shoe bottom stitching machines.
General machinery standards for presses
No ISO standard covers footwear machines as such. Cutting presses, sole presses and moulding machines are judged on crushing gaps (ISO 13854), guards (ISO 14120) and the emergency stop (ISO 13850).
ISO 12100 and CE marking
ISO 12100 is the base risk assessment standard. Regulation (EU) 2023/1230 replaces Directive 2006/42/EC in January 2027.

What moves the price of footwear making machines

  • Package scope: how many of the line's machines are in the quote.
  • Automation level of each machine in the package.
  • Lasts, moulds and dies, which are made for each design.
  • Exchange rate: imported machine prices usually move with the taka against the dollar.
  • Installation, commissioning and training days, included or quoted separately.

Lead times and delivery

A footwear package may arrive from several makers, and the lasts, moulds and dies for your designs are made to order, so the slowest item sets the start. Clearance at Chattogram adds time; customs officials say it stayed above 11 days through 2025. Roptan confirms dates for each machine, and any minimum, in the quote.

We deliver the package to your factory anywhere in Bangladesh. The seller places the machines in production order, connects power and air, sets the lasts and moulds, runs a sample batch and commissions the line with your team. You receive a machine list with serial numbers and customs lines, manuals, warranty terms and a VAT invoice (Mushak 6.3).

What we check for this order

  • Sample run testsWe ask for lasting and upper-to-sole adhesion results to ISO 17693 and ISO 17708 on shoes from the sample run.
  • Capacity matchWe check that each stage's capacity in pairs per day matches the others and your target.
  • Press guardingWe check guards and emergency stops on cutting presses, sole presses and moulding machines before handover.
  • Customs line and originWe check the customs line, model, serial number and origin of each machine against the import papers.

Questions buyers ask

Which customs lines cover footwear making machines?

More than one. Machinery for making or repairing footwear sits under HS 8453, and sewing machines under HS 8452. Ask the seller to name the customs line for each machine on the quote, so the import papers match the package.

What tests should the sample shoes pass?

At least lasting and sole adhesion. ISO 17693 checks that the upper can be lasted without damage, and ISO 17708 checks how well upper and outsole stay joined, with ageing conditions for production control. Condition samples to ISO 18454, and add the flex, abrasion or slip tests your buyers name.

Do I need new lasts for a new line?

Usually, for each design. A last is the foot-shaped form the upper is shaped around, made of hardwood, cast iron or high-density plastic. State the size system and the last measurements, so the lasting machines are set to them.

Can I import used footwear machines?

Check first. Confirm the current Import Policy Order rule for the exact machine before you commit, and ask for its age, service history and a running test. Then check that its moulds, dies and spares fit your designs.

How soon will I hear back about garment and footwear machinery?

Within 48 hours of a complete requirement, with a price and a delivery date. A requirement is complete when it has the model or specification, where it is needed and by when.

Who do I deal with?

With Roptan, when Roptan manages the order: we buy from the verified seller and deliver to you. With the supplier directly, when you post on the requirement board and choose a quote yourself.

Other garments machinery products

Each product type has its own page as it is published; until then its card opens the category form.

All garment and footwear machinery