Managed sourcing from Bangladesh, for export and for buyers at home
Get it sourced

Power and energy · Solar panels

Solar inverter supplier in Bangladesh

Roptan is your solar inverter supplier in Bangladesh. Tell us the array size, phase, sanctioned load and backup needs: we source grid-tied, hybrid or off-grid inverters from a verified seller, check the certificates for the exact model and deliver to your site.

  • Verified sellers
  • Checked before it ships
  • Delivered by Roptan

Get solar inverters sourced

Prefer to deal with suppliers yourself? Post it on the requirement board

Buying solar inverters in Bangladesh

A solar inverter converts the direct current from panels into AC for the building, and it uses maximum power point tracking to draw the most from the array. It also sets how many AC watts reach your loads. Factories and commercial sites in Bangladesh usually buy three-phase units; homes and shops on single phase have been able to net meter since 2025.

A solar inverter supplier in Bangladesh has to match the unit to the utility's rules as well as the array. Tell Roptan the system by form or chat. We source from verified sellers, check the model against SREDA's list and its BDS certificates, and deliver; the seller installs and commissions it. You deal with Roptan only.

Kinds of solar inverter

String inverters

One unit takes several panels wired in series. Choose them for most homes, offices and factory roofs.

Central inverters

Large units, typically actively cooled, for big ground arrays and plant rooms, with one location to service.

Microinverters and power optimisers

Microinverters handle one panel or a pair each. Optimisers track power per panel but leave conversion to AC to a string inverter. Choose either to track output panel by panel.

Hybrid inverters

These manage the array, a battery and the grid together, and can keep selected loads running in an outage. Choose them when load shedding matters more than the lowest price per kW.

Off-grid inverters

Units that run without a grid connection, so they need no anti-islanding protection. Choose them for remote sites, pumps and buildings with no utility supply.

How to specify a solar inverter

AC rating
Give the kW AC you need. For net metering the AC output may not exceed your sanctioned load, and at medium voltage and above 80 percent of transformer capacity.
Phase
Single or three phase at 50 Hz. Three-phase units are generally for industrial and commercial sites; single-phase customers can now net meter too.
Efficiency evidence
Ask for MPPT efficiency to IEC 62891 and overall efficiency to EN 50530. Conversion efficiency above 98 percent was reached by 2019, so compare test figures.
Backup loads
A grid-tied unit stops when the grid fails. If loads must run in outages, list them and the hours, so the seller can size a hybrid or backup unit.
Generator on site
PV with a diesel generator is a hybrid system and needs a control arrangement for that mix. Say whether a generator runs and how often.
Grid settings and monitoring
Protection settings must match the utility's requirements, which it checks at inspection. Ask what monitoring is included, with IEC 61724-1 as the reference.

Certificates a solar inverter needs

BDS IEC 62109-1 and 62109-2
Safety of power converters in PV systems: general rules, then particular rules for inverters. On SREDA's list of mandatory BDS updated 10 February 2026.
BDS IEC 61727 and BDS IEC 62116
The utility interface, and the test of islanding prevention, which proves the unit stops feeding a dead grid. Both are on the same SREDA list.
SRO 202/2021 and SRO 203/2021
Ministry of Industries orders that made BDS compliance and the BDS mark mandatory for solar inverters as well as panels. BSTI lists inverters under mandatory certification.
SREDA approved inverter lists
Separate single-phase and three-phase lists, each entry with a model and capacity. Approval rests on reports from SREDA-enlisted accredited labs, with an online NOC.

What moves the price of a solar inverter

  • Rating and phase: the kW AC rating and single or three phase set the unit you pay for.
  • Grid role: a hybrid unit also manages a battery; compare it with a grid-tied unit plus your outage plan.
  • Import duties and taxes on imported inverters; ask for them to be shown in the quote.
  • Replacement: inverters fail or wear out within a system's life, so allow for one in the lifetime cost.
  • Monitoring and commissioning: ask whether monitoring access and recorded settings are included.

Lead times and delivery

Delivery depends on whether the model and rating are in stock or imported, on the number of units, and on SREDA listing for net metering; Roptan confirms dates in the quote. The 2025 net metering guidelines then set process times: utility approval within 10 working days, installation filed within 8 months, and the contract within 15 working days of the checklist.

We deliver the inverters to your site anywhere in Bangladesh. The seller mounts and wires them, sets protection and grid settings to the utility's requirements, and commissions the system with IEC 62446-1 test sheets. Papers: model and serial list, BSTI certificate copy, recorded settings, monitoring access, warranty terms and a VAT invoice (Mushak 6.3).

What we check for this order

  • Model and capacity on SREDA's listFor net metering we check the exact model and capacity against SREDA's single-phase or three-phase approved list before ordering.
  • BDS mark and safety certificateThe BSTI certificate and an IEC 62109 safety certificate for the exact model quoted, not a related model in the same range.
  • Anti-islanding reportThe IEC 62116 test report for the model, since the utility needs the unit to stop feeding a dead grid.
  • Settings at commissioningProtection and grid settings recorded on the commissioning sheet and matched to the utility's requirements before handover.

Questions buyers ask

Will a grid-tied inverter keep power on during load shedding?

No. When it detects no grid it stops producing, to avoid islanding, which is a safety risk on the lines. For power in outages you need a hybrid or battery backup inverter that supplies selected loads. List those loads and their hours.

Can a solar inverter work with my diesel generator?

Yes, but PV with a diesel generator is a hybrid system and needs a control arrangement for that mix; a plain grid-tied unit is not enough. Tell the seller how often the generator runs and which loads it carries.

What size inverter do I need?

Start from the AC limit, not the panel kWp. For net metering, the inverter AC output may not exceed your sanctioned load and, at medium voltage and above, 80 percent of transformer capacity. The seller then matches the array to the inverter's input range.

Does an inverter need BSTI certification?

Yes. Since SRO 202/2021 and SRO 203/2021, solar inverters must comply with the BDS standards and carry the BDS mark to be sold. For net metering the model must also be on SREDA's approved list. Ask for both papers before you pay.

How soon will I hear back about solar panels?

Within 48 hours of a complete requirement, with a price and a delivery date. A requirement is complete when it has the rating, where it is needed and by when.

Who do I deal with?

With Roptan, when Roptan manages the order: we buy from the verified seller and deliver to you. With the supplier directly, when you post on the requirement board and choose a quote yourself.

Other solar panel products

Each product type has its own page as it is published; until then its card opens the category form.

All solar panels