Rooftop solar system supplier in Bangladesh

Use Roptan as your rooftop solar system supplier in Bangladesh. Send your bills, sanctioned load and roof details: we source a complete net-metered system from a verified seller, check every model and paper, and the seller installs and commissions it.

  • Verified sellers
  • Checked before it ships
  • Delivered by Roptan

Get rooftop solar systems sourced

Prefer to deal with suppliers yourself? Post it on the requirement board

Buying rooftop solar systems in Bangladesh

A rooftop solar system is a complete set: panels, mounting, inverters, cabling, protection and meters, connected to your building and the grid. Factories, offices, schools and homes in Bangladesh buy them to cut daytime grid use under net metering. On the government's figure reported by IEEFA, rooftop capacity reached 418.1 MW at June 2026, so several sellers can usually quote a job.

A rooftop solar system supplier in Bangladesh has to fit the design to the utility's rules as well as the roof. Send Roptan your bills and site details by form or chat. We source from verified sellers, check models against SREDA's lists and deliver; the seller installs and commissions. You deal with Roptan only.

Kinds of rooftop solar system

Owned net-metered systems (CAPEX)

You pay for the system and own it, and surplus units are credited on your bill. Choose this when you have the funds or a loan and want all of the saving.

Third-party owned systems (OPEX)

A company owns the system and bills you for the energy, so you avoid the up-front payment. The net metering contract is then signed by three parties: you, the utility and the investor.

Single-phase home and shop systems

Since the 2025 guidelines, single-phase customers and those on prepaid or smart meters can net meter. Choose a small single-phase system for a home or shop with daytime load.

Tin shed, parking and boundary arrays

The 2025 guidelines also allow panels on a tin shed fit to carry them, a parking lot or garage, a boundary wall or open land under your control, if the utility accepts the site.

What to give a rooftop solar system supplier in Bangladesh

Sanctioned load
The inverter AC output may not exceed your sanctioned load. Send the figure from your bill; under the earlier rules the cap was 70 percent of it.
Transformer capacity
At medium voltage and above, the system may not exceed 80 percent of the transformer's rated capacity. Give the transformer rating, or the combined rating of parallel units.
Supply voltage
State your connection: low voltage 230/400 V, 11 kV, 33 kV or 132/230 kV. It sets the customer class and the rate at which surplus credit is paid.
Meter type
Postpaid, prepaid or smart. Each system also needs a sealed RE accounting meter that records generation, and the customer pays for the net meter.
Row spacing and yield
Ask how row spacing and expected yearly output were worked out. SREDA's free net metering and inter-row spacing calculators let you check the figures.
Monitoring
Ask what monitoring is included. IEC 61724-1 is the reference for performance monitoring, which shows faults and falling yield.

Rules and standards for a rooftop system

Net Metering Guidelines 2025
Issued by SREDA under the Power Division, replacing the 2018 edition. They set eligibility, size limits, meters, settlement and the application steps through your distribution utility.
SREDA approved lists and mandatory BDS
Only listed modules and grid-tied inverters may be net metered. SREDA's mandatory BDS list, updated 10 February 2026, names IEC 62109, IEC 61727 and IEC 62116 for inverters.
IEC 62548-1 and IEC 60364-7-712
Array design, and wiring rules for PV supply systems. Ask that the drawings follow the current editions.
IEC 61643-31, IEC 62305-3 and IEC 61439-8
Surge protective devices for PV, lightning protection of structures, and low-voltage assemblies such as combiner boxes.
IEC 62446-1
Testing, documentation and commissioning of grid-connected systems: the basis for string test sheets and as-built drawings at handover.

What moves the price of a rooftop solar system

  • Ownership model: OPEX removes the up-front payment, while CAPEX keeps the full saving with the owner.
  • Financing: IEEFA and CPD report lenders asking for high collateral, which raises the real cost of a loan.
  • Duties and taxes on imported panels and inverters, and on mounting structure, walkways and DC cable.
  • Protection and roof work: surge devices, lightning protection, combiner boxes and walkways.
  • Operation and cleaning: IEEFA found many small systems stranded for lack of maintenance; price a yearly service.

Lead times and delivery

Equipment time depends on importer stock, system size and structure work; Roptan confirms dates in the quote. The 2025 guidelines set the process times: approval letter within 10 working days of a complete application, installation and checklist within 8 months, and the contract within 15 working days of verification, which becomes the commercial operation date.

We deliver the equipment to your site, and the seller installs, tests and commissions the system with IEC 62446-1 test sheets. The checklist then goes to your utility, which inspects the system, verifies and seals the meters and signs the contract. Papers: single-line diagram, as-built drawings, test sheets, serial lists, warranties and a VAT invoice (Mushak 6.3).

What we check for this order

  • Installer on SREDA's EPC listWe check the installer against SREDA's list of experienced EPC companies and ask for a running system of similar size.
  • Every model approvedPanel and inverter model numbers checked against SREDA's approved lists and the BDS mark before the order is placed.
  • Size within the limitsInverter AC output checked against your sanctioned load and, at medium voltage and above, the 80 percent transformer limit.
  • Handover fileTest sheets, as-built drawings, the sealed accounting meter and the utility's commercial operation date letter, before we close the order.

Questions buyers ask

Will the utility pay me for surplus solar power?

Yes. Exported units are credited against imported units, and credit left at the end of the settlement period is paid out to you at the BERC bulk rate for your voltage level. pv magazine reports payment to a bank or mobile banking account.

Can a home on a single-phase connection net meter?

Yes, since the 2025 guidelines. Single-phase customers and those on prepaid or smart meters can now apply online. You must be the utility's customer, with no unpaid bills, and own or control the roof.

How big can my rooftop system be?

Up to your sanctioned load, measured as inverter AC output. At medium voltage and above it also may not exceed 80 percent of your transformer capacity. A larger system needs a separate application to the utility.

What is the government rooftop programme?

A Power Division circular of 7 July 2025 asked for about 3,000 MW of rooftop solar on public buildings, with the distribution companies running the tenders. Government offices pay from public funds; schools, colleges, madrasahs and hospitals use the OPEX model and bear no cost.

How soon will I hear back about solar panels?

Within 48 hours of a complete requirement, with a price and a delivery date. A requirement is complete when it has the rating, where it is needed and by when.

Who do I deal with?

With Roptan, when Roptan manages the order: we buy from the verified seller and deliver to you. With the supplier directly, when you post on the requirement board and choose a quote yourself.

Other solar panel products

Each product type has its own page as it is published; until then its card opens the category form.

All solar panels