Managed sourcing from Bangladesh, for export and for buyers at home
Get it sourced

Power and energy · Generators

Synchronising panel supplier in Bangladesh

Running two or more generators and need a synchronising panel supplier in Bangladesh? Give us the sets, their ratings and the loads. Verified sellers price the panel, and we review protection, interlocks and settings before it reaches your site.

  • Verified sellers
  • Checked before it ships
  • Delivered by Roptan

Get synchronising panels sourced

Prefer to deal with suppliers yourself? Post it on the requirement board

Buying synchronising panels in Bangladesh

A synchronising panel connects two or more generator sets to one bus, so they share the load and one can stop for service while others run. Before each set joins, the panel matches its voltage, frequency and phase angle to the bus. Factories, hospitals and data centres adding capacity in stages ask a synchronising panel supplier in Bangladesh for one.

Send Roptan the sets, their ratings, the loads and any sets you may add later. We have verified sellers quote the same breakers, protection and controller, check the panel, its settings and papers, and deliver it. The seller handles installation and commissioning with your generators; you deal with one party.

Kinds of synchronising panel

Manual panels with a synchroscope

The synchroscope shows frequency difference and phase angle, and the operator closes the breaker at the right moment. It suits sites with trained staff who parallel sets by plan.

Lamp synchronising

Lamps wired between matching phases of the two systems. It is the least accurate method and gives no sign of which set runs faster.

Automatic synchronising panels

A controller matches and closes each set without an operator, as modern systems do. Choose it where sets must join the bus during an outage with nobody present.

Load-dependent start and stop

An option on some automatic panels: sets start and stop as demand rises and falls. Not every controller offers it, so the quote should say whether it is included.

Closed-transition changeover

A brief make-before-break overlap between set and mains for loads that cannot accept a gap. Typical limits are under 5 percent voltage difference, 0.2 Hz and 5 degrees, with the overlap under 100 ms.

How to specify a synchronising panel

Sets now and later
List each set's kVA and how many may be added. More sets raise the fault level the bus and breakers must withstand.
Load sharing
State droop or isochronous control. Sets on the same droop curve split load by their ratings; isochronous holds frequency steady, mainly in isolated systems.
Breakers
Give the normal current and the short-circuit current each breaker must interrupt, and whether larger breakers need adjustable trip settings.
Protection relays
List functions per set and on the bus by device number: 25 synchronism check, 27 and 59 voltage, 81 frequency and 32R reverse power.
Form of separation
From Form 1, no separation, to Form 4b. A higher form costs more but limits exposure when one section is worked on while others stay live.
Control wiring
Ask for current and voltage transformer ratios and relay settings in writing, since the synchronising and protection logic sits in the control section.

Standards for the panel and the sets

IEC 61439-2
The product standard for low-voltage power switchgear assemblies, rated up to 1,000 V AC, read with IEC 61439-1. Ask for the design verification, not a line saying the panel is built to IEC.
ISO 8528-4
Criteria for controlgear and switchgear of generating sets, revised in 2025: the generator-side reference for the panel's control functions.
ISO 8528-5
Covers each set's engine and alternator as a unit that may or may not run in parallel with the grid. Ask the set seller to confirm the set suits paralleling.

What moves the price of a synchronising panel

  • Number of sets, and the current ratings of busbars and breakers.
  • Air circuit breakers or moulded-case breakers, and adjustable trip settings.
  • The controller: manual synchroscope, check-synchronising relay, or automatic with load-dependent start and stop.
  • Protection relays fitted per set and on the bus.
  • Form of separation, interlocks, metering, communication and the floor space needed.

Lead times and delivery

No standard time applies. A synchronising panel is built to order from your load list, number of sets and protection list, so late changes to any of them delay it. Where parts are imported, currency and clearance steps add time. Roptan fixes the delivery date in its quote.

We deliver the panel to site. The seller places it, connects it to each set and the bus, confirms phase rotation with a meter before any load, then sets and records the synchronising, load-sharing and protection settings and commissions the system. Keep the settings record, wiring diagrams, design verification, test sheets and the VAT invoice (Mushak 6.3).

What we check for this order

  • Phase rotation firstWe check rotation is confirmed with a meter before load, since reversed rotation can destroy motor-driven loads.
  • Protection list against the quoteWe check every relay function quoted, per set and on the bus, is fitted and set.
  • Interlocks triedWe check each interlock, trapped-key schemes included, by trying it, so an unsafe close is blocked.
  • Settings signedWe check a named person sets and signs the synchronising, load-sharing and protection settings for the handover file.

Questions buyers ask

What happens if a set closes out of sync?

Connecting two unsynchronised AC supplies is likely to drive high currents that can severely damage equipment not protected by breakers or fuses. Closing is safe only when frequency difference and phase angle are both zero, which is why the closing circuit should be automatic or check-synchronised and interlocked, not a plain manual breaker.

Can sets of different sizes run together?

Yes. On the same droop setting, each set takes load in step with its rating, so a 500 kVA and a 250 kVA set carry about two thirds and one third. Before the panel is built, ask each set's seller to confirm its governor and voltage regulator suit parallel running.

Can the panel run our sets with the grid?

It can be designed for it, but grid-parallel running usually needs the utility's approval, and ISO 8528-6 notes it can call for supplementary test requirements. Ask the utility first; until approval is clear, specify a panel that keeps the sets and the mains apart.

Can we add a set later?

Yes, if you plan for it now. Tell the seller how many sets may join, so the busbars, breakers and fault rating suit the final number. Adding sets to a bus built for fewer can raise the fault level beyond what the breakers can interrupt.

How soon will I hear back about generators?

Within 48 hours of a complete requirement, with a price and a delivery date. A requirement is complete when it has the rating, where it is needed and by when.

Who do I deal with?

With Roptan, when Roptan manages the order: we buy from the verified seller and deliver to you. With the supplier directly, when you post on the requirement board and choose a quote yourself.

Other generator products

Each product type has its own page as it is published; until then its card opens the category form.

All generators