Managed sourcing from Bangladesh, for export and for buyers at home
Get it sourced

Power and energy · Generators

Gas generator supplier in Bangladesh

Planning captive power and need a gas generator supplier in Bangladesh? Send the sanctioned gas load, the daily running hours and any heat you could reuse. Verified sellers price the set on that basis, and we check rating, gas use and papers first.

  • Verified sellers
  • Checked before it ships
  • Delivered by Roptan

Get gas generators sourced

Prefer to deal with suppliers yourself? Post it on the requirement board

Buying gas generators in Bangladesh

A gas generator couples a gas-fuelled engine to an alternator and is built for long running, not occasional backup. Factories with a pipeline connection run one for captive power, often many hours a day, and some put its waste heat to work as hot water or steam. For anyone choosing a gas generator supplier in Bangladesh, the gas supply comes before the set.

Tell Roptan the sanctioned load, supply pressure and duty, by form or chat. We ask verified sellers to quote the continuous rating on your gas, compare offers on gas use per kWh, inspect the set with its documents and bring it to site, where the seller installs and commissions it.

Kinds of gas generator

Spark-ignited gas sets

Spark plugs light the gas, with no diesel on site. Typically chosen for base load or long daily running, they usually carry only a continuous rating, so size on that figure.

Dual-fuel and bi-fuel sets

A small diesel injection lights the gas, or the engine burns diesel and gas together. Either way you keep a diesel tank and diesel spares.

Combined heat and power sets

About half the waste heat is recovered as hot water from the jacket and coolers, with hotter heat in the exhaust. It pays where hot water, steam or absorption cooling is used on site.

LPG and propane sets

Where there is no pipeline, some sets run on stored LPG or propane. Do not assume a pipeline set gives the same output on LPG: the Wobbe index shows whether two gases interchange.

What to tell a gas generator supplier in Bangladesh

Gas connection and pressure
State the sanctioned load, the supply pressure range and who confirms both in writing. For a captive set, supply is the first risk.
Continuous rating
Ask for the continuous rating on your gas and at your plant room temperature. A gas engine block usually gives less than its diesel version, so never compare kVA one for one.
Gas analysis
Get the analysis from your distribution company and ask the maker for output on that gas, since composition varies.
Efficiency basis
Thermal efficiency is typically 35 to 45 percent on the lower heating value, which makers quote; networks usually bill on the higher value. Ask which basis applies.
Gas use at part load
Ask for gas use per kWh at 50, 75 and 100 percent load, and whether electrically driven cooling pumps are counted. Leaving them out flatters the figure.
Exhaust treatment
Say whether the engine is lean-burn, with less unburnt hydrocarbon, or stoichiometric with a three-way catalyst. Lean-burn engines do not pair well with that catalyst.

Standards and papers for a gas set

ISO 8528
Not diesel-only: it classifies application, rating and performance for sets driven by reciprocating internal combustion engines. Ask for the gas set's continuous rating under it.
ISO 3046-1
Sets how engine power and fuel consumption are declared. Ask for the gas consumption declared under it, with reference conditions and the gas used.
ISO 8528-6
Test methods for the whole set; engine and alternator keep their own. Grid-parallel running can need supplementary requirements.
Gas connection approval
Your distribution company's approval for the load. A May 2026 report said captive plants above 10 MW on gas need prior Power Division approval.

What moves the price of a gas generator

  • The continuous rating you actually get, since a gas engine yields less than the same block on diesel.
  • Electrical efficiency, which sets gas use per kWh for the set's life.
  • Heat recovery for hot water or steam, if in scope.
  • The gas train, pressure regulator and filtration, plus the exhaust treatment the engine needs.
  • The enclosure, and the cost of the gas connection and its approval.
  • The regulated gas rate set by BERC, which rose for new captive connections from April 2025.

Lead times and delivery

No fixed time applies. Most generators sold in Bangladesh are imported, so currency, duty and clearance can stretch delivery, and heat recovery adds to it. The gas approval may take longer than the equipment, so the quote should name the approval you need before delivery. Roptan confirms the date and any minimum in the quote.

We bring the set to your site. The seller places it, connects the gas line, exhaust and cables, and commissions it. At handover, ask for load test sheets with gas flow and pressure at each step, the fuel consumption declaration, manuals, the warranty and a VAT invoice (Mushak 6.3).

What we check for this order

  • Approval against demandWe check that the sanctioned load and pressure in your approval cover the set's gas demand at full load.
  • Rating on one basisWe check each quote gives the continuous rating on your gas, not a diesel or standby figure.
  • Stated heating valueWe check gas use per kWh at 50, 75 and 100 percent load names the heating value it assumes.
  • Gas readings in the load testWe check the load test logs gas flow and supply pressure at every step, so the claimed efficiency can be tested.

Questions buyers ask

Can a factory get a new gas connection for a generator?

Confirm with the distribution company before ordering. A 2020 circular stopped new connections to industry outside economic zones and industrial parks from April 2021. In April 2025 the government decided to resume industrial connections, with priority for export-oriented and EPZ factories. In May 2026 BPDB was reported to recommend reducing gas supply to captive plants; that is a recommendation, not a rule.

Is a gas generator cheaper to run than diesel?

Not always. BERC raised the gas rate for new industries and captive power from April 2025, and in May 2026 BPDB was reported to put captive plant efficiency at only 30 to 40 percent. Compare gas use per kWh and your connection's rate with diesel use at the same load.

Can a gas generator be our standby set?

For a small set, yes: emergency sets under about 150 kW on utility gas or propane are the usual exception. For larger standby duty diesel remains the usual choice. Tell us the duty and outage pattern, and we ask sellers to quote the fuel that fits.

Can we use the engine's heat?

Yes, if your plant needs hot water, steam or absorption cooling on site. Roughly half the waste heat comes out as hot water at up to 110 °C, and the exhaust carries hotter heat. Ask for heat recovery as a separate line in the quote.

How soon will I hear back about generators?

Within 48 hours of a complete requirement, with a price and a delivery date. A requirement is complete when it has the rating, where it is needed and by when.

Who do I deal with?

With Roptan, when Roptan manages the order: we buy from the verified seller and deliver to you. With the supplier directly, when you post on the requirement board and choose a quote yourself.

Other generator products

Each product type has its own page as it is published; until then its card opens the category form.

All generators